Cabling that gets labelled, tested and written down.
Cat6 and Cat6a copper, fibre where the distance needs it, terminated properly and handed over with test results and a plan of what goes where.
Cabling is the part of the network nobody thinks about until it is wrong, and then it is expensive to put right because it is inside the walls. The failures are almost always the same: runs put in wherever was convenient rather than where the work happens, nothing labelled at either end, and no record of what was done.
We plan runs around how the building is actually used, terminate to standard, test every port and hand you the results. When someone asks in three years which port serves the machine in the far corner, the answer is on a plan rather than in somebody's memory.
What drives the cost
Cabling is quoted per run against a schedule of works. The things that move the price:
- How many outlets, and how many runs go to each one.
- The building. A modern office with accessible ceilings is a different job from a Victorian mill or a working warehouse.
- Cable routes - whether there is existing containment to follow or we are creating it.
- Whether we are working around you in the day or coming in out of hours.
The survey is where the real number comes from. A price given over the phone without someone seeing the building is a guess, and usually an optimistic one.
What you get
What an install involves
Cat6 and Cat6a copper
The sensible default for almost every office and unit. We will tell you when Cat6a is genuinely worth the extra and when it is not.
Fibre where it earns its place
Between buildings, across a yard, or anywhere the distance puts copper out of spec. Not because it sounds better on a quote.
Cabinets and patch panels
Properly sized, properly mounted, with enough room to work in. Including tidying up cabinets somebody else left in a state.
Containment and routing
Trunking, tray and conduit run neatly and to regulation, planned around the fabric of the building rather than fought against it.
Testing on every port
Each run tested before we sign off, and the results handed over as a PDF you keep.
Labelling at both ends
Every outlet and every patch panel port labelled and recorded, so nobody is ever tracing a cable by unplugging things to see what goes dark.
A plan of the building
A floor plan showing where the outlets are and which port each one lands on. Yours to keep and to hand to anyone who works on it later.
How it works
How a cabling job runs
No engineer turning up unannounced, and no invoice with surprises on it.
-
1
Survey
We walk the building, look at the fabric, the existing routes and where people actually sit or work. Free and with no obligation.
-
2
Schedule of works
Every run listed, a fixed price, and a clear note of anything that could change it - asbestos surveys, listed building constraints, a ceiling nobody can get above.
-
3
Installation
Booked around you, including evenings and weekends so your team is not sat idle. We clear up after ourselves.
-
4
Handover pack
Test results, labelled ports, floor plan and cabinet photographs.
Where we cover
Structured cabling across the Midlands
We are based in Redditch, so most on-site work is within about 45 minutes. We travel further for larger jobs - travel is always quoted up front.
- Redditch
- Bromsgrove
- Alcester
- Studley
- Evesham
- Droitwich
- Worcester
- Solihull
- Birmingham
- Stratford-upon-Avon
Questions
The things people ask first.
Usually goes with
Most of this work comes as part of something bigger. Ask about any of it in one go and you get one scope, one price and one team.
Tell us what you need